Fibre Optic Blowing Services
FDNS provides engineered fibre optic cable blowing, jetting and duct installation for FTTP, telecoms, campus, private-network and outside-plant fibre routes. We assess the cable and duct as one system, considering cable diameter, stiffness and weight together with duct size, route length, bends, gradients, friction, chamber access and manufacturer limits.
Depending on the route, FDNS can support pneumatic air-assisted blowing, hydraulic-assisted installation using controlled airflow and drive force, or water-assisted cable floating where suitable. The service can be integrated with duct proving, PIA, jointing, splicing, OTDR and optical-loss testing for a complete route from prepared duct to proven fibre.

What is fibre optic cable blowing?
Fibre optic cable blowing uses compressed air and specialist equipment to propel or assist optical cable through a prepared duct or microduct. Compared with conventional pulling, the method can reduce tensile loading on the cable and is particularly effective on long or segmented routes when the duct system has been designed and prepared correctly.
FDNS begins by proving the route and checking duct size, cable diameter, section length, bends, lubrication requirements and equipment compatibility. During installation we control pressure, speed, drum handling and intermediate access points in line with the cable and equipment limits.
The installed route is recorded and the fibre can then be inspected and tested to provide evidence that deployment has not introduced excessive loss, damage or unidentified route issues. This gives the client a controlled installation record rather than only confirmation that the cable reached the far end.
What our fibre optic cable blowing and duct installation service includes
Duct proving and route-readiness assessment
Cable and duct compatibility engineering
Pneumatic, hydraulic-assisted and water-assisted methods
Pressure, speed and pushing-force control
Long-route planning and intermediate handling
Post-installation splicing, OTDR and route handover
Prove ducts and route condition before fibre cable blowing begins
FDNS checks duct continuity, bends, gradients, chambers, couplings, contamination, water and blockages before cable installation. This prevents the blowing machine being used to compensate for an unprepared or unsuitable route.
Match cable construction and duct filling ratio to the installation method
Cable diameter, stiffness, weight, sheath and duct internal diameter directly influence performance. FDNS assesses the cable-and-duct combination before selecting pneumatic blowing, hydraulic-assisted installation or water-assisted floating.
Control pressure, airflow, speed and pushing force throughout installation
Cable speed, pressure, airflow or water flow, pushing force and drum handling are monitored during the operation. If resistance changes unexpectedly, FDNS investigates the route rather than simply increasing force, reducing the risk of cable damage.
Plan long blowing sections around chambers, drums and intermediate access
Long or complex routes may require staged blowing, intermediate chambers or carefully positioned drums. FDNS plans installation sections around route geometry, available cable lengths and future joint positions.
Connect cable blowing with splicing, OTDR and complete route handover
FDNS can continue from cable installation into jointing and optical testing, linking chamber references and installed lengths to splice records and test files. This gives the client one traceable path from empty duct to tested fibre.
How FDNS delivers controlled fibre cable blowing from duct proving to tested handover
1
1. Survey and prove the duct route before cable installation
2
2. Match the cable, duct and blowing or floating method
3
3. Prepare equipment, chambers, cable drums and installation sections
4
4. Install fibre under controlled pressure, flow and pushing force
5
5
5. Verify installed length, cable condition and optical performance
6
6. Handover route records, test evidence and installation data